From: route@monster.com
Sent: Friday, April 15, 2016 10:21 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Full name, present address and Contact details SURNAME:
SHEKARI, FIRSTNAME: Matt Address: Frisco –TX-USA- POST
CODE: 75034, CELL PHONE: +19723392943, EMAIL: shekarimat@gmail.com, I am
green card holder OBJECTIVE: I’m interested in a Telecommunications Construction
Optimization Engineer Tech opportunity with a leading telecommunications
team. My knowledge and experience in the telecommunications industry
will be extremely beneficial to a strong corporation and leadership. I
hope to be provided the opportunity to use my experience in the industry to
promote team spirit and success in your organization. SUMMARY: · Have
worked with 6 different operators MCI, MTN, MOBINNET, RIGHTEL, TCK and Asia
cell and with different vendors such as Nokia Siemens, Ericsson, Samsung, ZTE
and Huawei more than 10years experience. · Confidence,
dynamic and self-motivated engineer and Tech, who is capable to perform tasks
at high level and under strict deadlines and conditions, · RF/RAN/Transmission/NetworkOptimization/DriveTest/NetworkDesign&Planning,
GSM/FDMA/TDMA/GPRS/EDGE, WIMAX, 3G/UMTS/WCDMA/FDMA/CDMA/HSPDA, TEMS
Investigation/AXTIX/NEMO for Wireless networks and Perform input (RFDS and
Checklist). A hard working planning and optimization engineer, who can
perform duties individually or supervising a team of planning and
optimization engineers. Given certificate by HUAWEI and ZTE for Performing at
a level considerably above DT/RVT role as supervisor and manager and
technician. · Extensive
background in Site Acquisition, A&E, Design Development, Raw-land, Tenant
Improvement, Co-location deployment, Technical Site Survey, TSS LOS as
supervisor and technician and engineer. Training site acquisition staff and
preparing SSR and making contract with owner and etc. · Constriction
Supervisor successfully delivered all the wireless networks Civil Work
projects. Choosing subcontractor and training them, Managing staff and
subcontractors, Training CV staff and preparing DDR and making and etc, Good
knowledge with all of the CW equipment and standards and steps. · Telecom equipment installation and commissioning and
Integrations for Wireless Network (BTS/Node B, BSS/RNC, NSS/Core Network) and
fixed network; New/Swap/Expansion; BOM development and materials management
as well as a multitude of other site development activities as supervisor and
technician and engineer. · Expert in
Fiber and cabal projects as supervisor and manager and technician. FTTH/FTTX. · Project
Control, Quality Control/QA/QC and Clean up, PAC/FAC as supervisor and
engineer. · DAS
network deployment. EDUCATION: Azad University at
Iran
ElectricityBachelor 03-2004 till 07-2007 Azad University at
Iran
ElectricityAssociate 09-2000 till 02-2004 PROFESSIONAL ZTE Optimization by EHP
Company
Huawei Optimization by NDT Company Ericsson Integration by NDT
Company TECHNICAL ·
Proficient in Microsoft Office applications MS. Project,
Word, Excel, PowerPoint, Visio, Outlook ·
v-lookup and pivot tables ·
ICDL - MSCE ·
TEMS and ACTIX ·
BTS and NODE B Installation and integration for Huawei and
ZTE and Ericson ·
BSC & MSC – CORE NETWORK & VAS - DATACOM - A &
S – OPTICALNETWORK Installation and integration for Huawei and ZTE ·
GPS PROFESSIONAL EXPERIENCE A. Engineer/Tech at TOPTEL LLC
January 2014 Current USA – TX –
Richardson Responsibilities and
Qualifications DAS project Marketing -
Detailed RF design with IB wave – Site Survey –Installation /
Integration/Construction We usually use
Commscope Equipment My team install
Donor Antenna, Riser Cable, ION B remote Unit, ION B Master Unit, Node a
Repeater, Omni Coverage Antenna, Splitters and Combiners and Plenum Cable. Enterprise project TOPTEL is official
Ericsson agent in Enterprise solution. I was responsible for Design and
Installation of enterprise voice,
data and networking. From Wi-Fi, business communications and UC solutions, to
flexible microwave transport and enterprise-class Ethernet switches. B. Technical office at NDT and
EHP (Contractor of Ericsson and Huawei and Nokia Siemens and Samsung and ZTE)
March 2007-DEC 2013 Middle East Projects: Site Acquisition: Ericsson:150 sites of IRANCELL in Region 5&6 , 28 in
building sites of MCI in Tehran Huawei:120
BTS sites of IRANCELL phase1 in Region 2
- 4 ,40 Sites of IRANCELL phase4 in Region4, 100 sites of MOBINNET
WIMAX Nokia: 12 in building sites of MCI
in Tehran Samsung:20 sites of MOBINNET
WIMAX Civil Works: Huawei: 2 roof top sites of IRANCELL phase1 in region2 , 11 sites of
IRANCELL phase1 in region2 , 40 sites of IRANCELL phase4 in region4,
100 WLL sites in Kermanshah , 80 sites of MTN-WIMAX, 100 sites of MOBINNET
WIMAX Ericson: 150 sites of
IRANCELL in region5 Samsung: 20
sites of MOBINNET WIMAX TELECOM IMPLEMENTATION (TI) and TSS/LOS and Commissioning and
design and Etc: Huawei:
2 sites of IRANCELL in region2 phase1, 100
BTS sites & 33 MW sites & 45 SDH sites of Kermanshah in WLL, IOOC
project (11 oil platforms & 5 islands),Frame bidding 2009 project
MCI&MTN&TIC&TCI (including 380 wireless core network, 106 optical
network, 123 data com and 88 A&S ), Frame bidding 2010 project
MCI&MTN&TIC&TCI (including 168Wireless core network, 302optical
network, 150data com, 8A&S, 469 BTS&MW, 12 BSC&MSC, 94MW,
44odf&ddf), MTN-WIMAX (including 120
sites), WLL BUSHEHR (including 39 sites), MOBINNET WIMAX 100 sites, RDG WIMAX 40 sites,
MTN NMS project 750 sites region4, MCI
Modernization ,MTN-WIMAX (including 140
SITE survey and MW survey), RDG WIMAX 40
MW survey, Pre survey of 600 sites of Iran
cell in Region4 for phase 7-8-9, Pre survey of 200 share sites of MOBINNET in
Tehran, Frame bidding 2010 project
(605Site Survey &Site Planning) Ericson:
2 sites of IRANCELL in region 5 and 6 in building sites of MCI in Tehran, 100
sites swap from Nokia to RBS6000 Nokia: 6
in building sites of MCI in Tehran Samsung:
MOBINNET WIMAX 20 sites DT/RVT and optimization 2G - 3G ZTE: Drive test and optimization of 150 3g sites for
RIGHTEL IN KARAJ province HUAWEI: Frame
bidding 2010 project (including 481DT&RVT) for MTN Responsibilities and
Qualifications Construction Supervisor ·
Managed 7 SA teams 10 CW subcontractors
simultaneously ·
Monitored day to day activities of all teams and subcontractors
as well as Microwave and GSM equipment vendors. ·
Lead in overall execution of site activity. ·
Developed a market approved site audit process that
resulted in our team successfully auditing 500(+) sites with less than 10%
revisits and/or rejections. ·
Implemented a market level damage control process that
allowed Bechtel to gain confidence from their client and secure additional
awards. · Developed
a site audit process that resulted in a 50% reduction in time needed to
produce a customer acceptable site drawing/inventory and constructability
report. · Material
Management · QA and QC Network Deployment, installation and
Integration
Supervisor
·
Managed a group of many site development professionals for
cellular and microwave systems as needed to meet customer needs.10
telecommunication Technicians and 7 TI subcontractors. ·
Monitored day to day activities of 10 to 15 market level
project managers. ·
Lead in overall project evaluation, pricing, cost and
budget analysis. ·
Developed Task Orders/SOW’s with estimation for a major
portion of Ericsson/Huawei/Samsung/Nokia Siemens’s site development work on
projects for MTN and MCI and MOBINNET. ·
Played a vital role in the inspection and auditing
activities of various TI projects ·
Coordinated the deployment of our path profile teams. ·
Assisted in the development of BOM’s for Microwave and
cellular system build-outs in whole country. · Worked
closely with vendors, to fill schedule requirements. · Primary
lead in contract negotiations with potential vendors on a project by project
basis. · QA and QC Technician · Site
Acquisition to install Ericson RBS and Huawei DBS and Nokia in building IBS,
Greenfield and roof type. · v-lookup
and pivot tables · Site
Design · Installation,
Dismantle and removal,
commissioning and integration new and swap of Ericson and Huawei and Nokia
RBS/BTS, RET, Antennas and RF equipment, Power and LMU.I also did channel
adds and deletion on the Nokia Ultra site. · Installation
and commissioning with best quality and speed and get QA at first inspection
of employer: BTS & Node B & POWER & SDH & MW (INDOOR
and OUTDOOR) - BSC & RNC & NSS & CORE NETWORK - VAS - DATACOM - A
& S – OPTICALNETWORK for GSM&3G&WIMAX&Fixed phone · Network
Installer Installing DSL and wireless (WI-FI) networks in homes and
businesses, Maintaining CISCO routers and DSL. · De-installing
SIMENS GSM cabinets and installing Nokia equipment. Performing channel
sweeps/gains and site surveys for Cingular on Nokia GSM sites. Project lead
for Nokia City talk/Ultra site swap out for MCI. Ericsson channel ads and
troubleshooting for TNS/Centennial Wireless. O&M work on Ericsson
2206/2106 for Centennial Wireless. Field Engineer ·
Site Survey for Ericson swap project – Nokia to Ericsson
RBS 6000 ·
Commissioning, Installation, integration, and
troubleshooting of Ericsson 3000 and 6000 series cabinets for MTN. I also
programmed the MCU, set RETs, and installed boosters RXAIT, and combiners. My
job also included support and maintenance on the Ericsson 2000, 3000, 6000
series cabinets. · Channel
deletion and radio harvesting of Lucent TDMA radios for AWS.O&M for
Ericsson UMTS. · Installed,
integrated and maintained RBS 2000, 3000, 6000. DAS
(distributed antenna system) Engineer · Installation, Commissioning
and Design Of Ericsson In building and Micro sites for MTN Project in
Tehran · Installation, Commissioning
and Design Of Nokia Siemens In building and Micro sites for MCI
Project in Tehran DT/RVT Specialist C. FIBER AND CABALING
Technician at FEO September2004-March2007 Middle east Responsibilities and
Qualifications A. Caballing 1.
Outdoor: Trench along the selected routes and removal and reinstatement soil
then conduct sub duct then Conduct fiber optic or copper cable (Coaxial
&Twist pair) ; Trench along the selected routes and removal
and reinstatement soil and Bury Fiber optic or copper cable (Twist pair)
; Install tower and caballing Self-support fiber optic or
copper cable (Twist pair) 2.
Indoor: Drilling hole through ceiling or wall etc. install PVC pipe
or flexible Conduit or duct or draw rope etc. conduct fiber optic
or copper cable in or out wall (Coaxial &Twist pair) B. Make connection for 1. Copper
cable: Coaxial Connectors like BNC (RG59) and RG6 & Twist pair Connectors
like: RG11 and RG45 and BT431 – Splice case 2. Fiber optics: FA
(SC) and etc Connectors, Splice case and mechanical splice (precision fiber
cleaver), Fusion C. TI for 1. Cooper cable: Cable
tester 2. Fiber optic: Installation of ONU (ONT) & ODF &
FDH D. Testing for 1. Copper Cable 2. Fiber
optic: OTDR -Optical power meter-Fiber optic fault locator -Optical Fiber
Ribbon Tester Etc. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|